EXPENSIVE BRIDGES
HIGHWAYS BOARD’S WORK Press Association WELLINGTON, To-day. The Main Highways Board reports that during the four years the board has beeVi operating, the cost of bridge construction has constituted large proportion of its expenditure. This class of expenditure is by no means, at an end. as there are now 14 bridges in various parts of the Dominion that are either being constructed or will have to be reconstructed in the immediate future, the total cost of which is £300.000. The largest t these is the Balclutha Bridge, which is estimated to cost £ 60.000.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19290309.2.30
Bibliographic details
Sun (Auckland), Volume II, Issue 608, 9 March 1929, Page 5
Word Count
95EXPENSIVE BRIDGES Sun (Auckland), Volume II, Issue 608, 9 March 1929, Page 5
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.