BRITISH RAILWAYS
SOUTHERN ELECTRIFICATION JOB SOON COMPLETED British Official Wireless RUGBY, Monday. The Southern Railway Company’s suburban electrification scheme, on the central section of its railway, will be completed by March 3, four years after its adoption. The new electric services will then come into operation. The services previously worked by means of overhead ■wires will be operated on the rail, or direct current system. They have been remodelled and increased in some cases to as much as 200 per cent. . over the previous steam services.
.A new signalling system has also been installed, the stations have been rebuilt and the platforms have been remodelled.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19290220.2.86
Bibliographic details
Sun (Auckland), Volume II, Issue 593, 20 February 1929, Page 9
Word Count
105BRITISH RAILWAYS Sun (Auckland), Volume II, Issue 593, 20 February 1929, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.