NEW CANAL TO BE MADE
WAITAKARURU IMPROVEMENT (Front Our Own Correspondent) NGATEA, To-day. A canal is to be made in the Waltakaruru district in the near future by the Lands Drainage Department to divert the drainage into the Maukoro Canal from the Pouarua Road district, which now flows through tic Ilauraki Plains West Drainage Board’s area and menaces settlers near the Piako riverfront. The canal will be made by a dredge, and its passage up the Maukoro Canal from the Gulf will necessitate the temporary removal of a bridge on the Paeroa-Pokeno main highway. Should the Interruption be for more than a few hours traffic will be diverted to a dam in the canal a few miles away.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19290109.2.130
Bibliographic details
Sun (Auckland), Volume II, Issue 557, 9 January 1929, Page 11
Word Count
118NEW CANAL TO BE MADE Sun (Auckland), Volume II, Issue 557, 9 January 1929, Page 11
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.