NEWMARKET TRAMS
RECONSTRUCTION STARTED Alterations to the tram-tracks in the centre of Newmarket have been commenced. Workmen are engaged in laying the concrete foundations for the new points and track which will carry the tracks out into the centre of the Triangle. The new safety zone at this point will be installed after the new tracks are completed. A few days will have to be allowed for the concrete to set, and the balance of the work is then expected to occupy about a fortnight.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19281025.2.160
Bibliographic details
Sun (Auckland), Volume II, Issue 494, 25 October 1928, Page 13
Word Count
85NEWMARKET TRAMS Sun (Auckland), Volume II, Issue 494, 25 October 1928, Page 13
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.