URGENT WORKS
SCHOOLS TO BE BUILT Reporting to the Auckland Education Board to-day, the urgency committee recommended that the order of building works should be as follows: Group A of first urgency.—Glen Eden, additions; Grafton, remodelling; Helensville, secondary department; Manurewa, additions; Mangapai, remodelling; Marlow, school building; Maungatautari No. 2, new site, and removal and enlargement of building; Milford, additions; Pokapu, school site, building to be considered later; Richardson Road (Mount Albert), additions; Tauranga H.H.. manual training school and additions to secondary department; Te Awamutu D.H., additions; Whareora, site and building. Group B of first urgency.—Bombay, remodelling; Hamilton East, additions; Silverdale, additions: Taheke, additions; Taipa, school building; Waihopo. additions.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19280905.2.144
Bibliographic details
Sun (Auckland), Volume II, Issue 451, 5 September 1928, Page 13
Word Count
108URGENT WORKS Sun (Auckland), Volume II, Issue 451, 5 September 1928, Page 13
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.