IMPORTANT NORTH SHORE DEVELOPMENT—Work is proceeding on the storage tunnel of the TakapunaMilford sewerage scheme. On the completion of the tunnel an esplanade will be constructed. Picture shows the Milford section of the work, at Black Rock.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19280522.2.166.2
Bibliographic details
Sun (Auckland), Volume II, Issue 360, 22 May 1928, Page 16
Word Count
37IMPORTANT NORTH SHORE DEVELOPMENT—Work is proceeding on the storage tunnel of the Takapuna-Milford sewerage scheme. On the completion of the tunnel an esplanade will be constructed. Picture shows the Milford section of the work, at Black Rock. Sun (Auckland), Volume II, Issue 360, 22 May 1928, Page 16
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.