FURTHER WATER STORAGE —The new reservoir in Khyber Pass, to hold 5,000,000 gallons, is now taking shape. The excavation work has been completed, and the men are at present engaged in erecting 140 tons of steel reinforcement in preparation for concreting.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19280209.2.67.1
Bibliographic details
Sun (Auckland), Volume I, Issue 274, 9 February 1928, Page 11
Word Count
41FURTHER WATER STORAGE—The new reservoir in Khyber Pass, to hold 5,000,000 gallons, is now taking shape. The excavation work has been completed, and the men are at present engaged in erecting 140 tons of steel reinforcement in preparation for concreting. Sun (Auckland), Volume I, Issue 274, 9 February 1928, Page 11
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.