HOLD UP ON NORTHERN LINE—A railway mishap occurred at Swanson yesterday morning when a carriage, during shunting operations, was derailed and overturned. After a delay of an hour or so, the normal time-table was resumed.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19280123.2.166.1
Bibliographic details
Sun (Auckland), Volume I, Issue 259, 23 January 1928, Page 14
Word Count
35HOLD UP ON NORTHERN LINE—A railway mishap occurred at Swanson yesterday morning when a carriage, during shunting operations, was derailed and overturned. After a delay of an hour or so, the normal time-table was resumed. Sun (Auckland), Volume I, Issue 259, 23 January 1928, Page 14
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.