THE BUILDING SIDE. —The stone-crushing plant on the other side of the Waitakere tunnel, which provided the metal for Waitakere dam. The tram-line and water line proceed from this spot, through a mile of magnificent bush, to the dam.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19280121.2.137.1
Bibliographic details
Sun (Auckland), Volume I, Issue 258, 21 January 1928, Page 17
Word Count
39THE BUILDING SIDE.—The stone-crushing plant on the other side of the Waitakere tunnel, which provided the metal for Waitakere dam. The tram-line and water line proceed from this spot, through a mile of magnificent bush, to the dam. Sun (Auckland), Volume I, Issue 258, 21 January 1928, Page 17
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.