NEW LYNN SEWERAGE
GOOD PROGRESS REPORTED Good progress is being made in connection with the New Lynn sewerage scheme. What is known as the second contract is developing according to schedule time, and it is anticipated that this section of the scheme will be completed by the date specified by the contractors.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19280118.2.111.3
Bibliographic details
Sun (Auckland), Volume I, Issue 255, 18 January 1928, Page 12
Word Count
52NEW LYNN SEWERAGE Sun (Auckland), Volume I, Issue 255, 18 January 1928, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.