ARTERIAL ROAD
AUCKLAND TO WELLINGTON WORK AT NGAHAURANGA (From Our Resident Reporter. ) WELLINGTON, Wednesday. Plant is being erected and material gathered for bitumenising the main Wellington-Auckland road through the Ngaliauranga Gorge leading from the Hutt Road out of Wellington to Johnsonville. About half a mile of the lower porbut the remainder of the road, particularly on some of the most dangerous corners, is in a disgraceful condition. The actual surfacing should commence shortly.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19280105.2.154
Bibliographic details
Sun (Auckland), Volume I, Issue 244, 5 January 1928, Page 11
Word Count
73ARTERIAL ROAD Sun (Auckland), Volume I, Issue 244, 5 January 1928, Page 11
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.