LIMITED DELAYED
GOODS TRAIN BAULKS IN CUTTING NOVELTY FOR REMUERA The failure of a goods train to climb the Remuera cutting last evening delayed the Limited for 40 minutes. Rain on the rails had made them slippery, and the wheels of the engine could not grip, despite the use of sand. When all else failed the Limited and a suburban train which was following joined forces and pushed the goods train up the incline. This made an enormous length of trains which reached from the Dilwortli Avenue footbridge to St. Mark’s Road overbridge. The noise of puffing engines and the length of train brought the residents out in full force to watch it. The combined Limited and goods train travelled together as far as Otahuhu where the good 3 was shunted on to a siding.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19271201.2.139
Bibliographic details
Sun (Auckland), Volume I, Issue 216, 1 December 1927, Page 15
Word Count
135LIMITED DELAYED Sun (Auckland), Volume I, Issue 216, 1 December 1927, Page 15
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.