PAEROA PROGRESS
GENERAL BUILDING ACTIVITY The Criterion Bridge. over the Ohinemuri River at the lower end of the town, which is to replace the old one. is now being pushed ahead in real quick time. The last flood caused considerable delay. A deal of anxiety will be relieved when the bridge is finished, as the old one, although only of about 20 years* standing, is not considered too safe. Since the hotels have been reopened Paeroa seems to be moving ahead by leaps and bounds. The borough council has recently granted several nermits lor new buildings, which are being erected in brick and concrete.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19270819.2.112.1
Bibliographic details
Sun (Auckland), Volume I, Issue 127, 19 August 1927, Page 12
Word Count
104PAEROA PROGRESS Sun (Auckland), Volume I, Issue 127, 19 August 1927, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.