POWER FOR MARLBOROUGH
WAIHOPAI SCHEME DIVERSION TUNNEL CLOSED Press Association. BLENHEIM, To-day. The gates of the diversion tunnel of the Waihopai hydro-electric scheme were closed yesterday evening. The dam is filling, and the official switching- on of the power is now within sight. The scheme will provide *>ower and light for practically the whole province at a cost of £300,000.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/SUNAK19270709.2.168
Bibliographic details
Ngā taipitopito pukapuka
Sun (Auckland), Volume 1, Issue 92, 9 July 1927, Page 13
Word count
Tapeke kupu
60POWER FOR MARLBOROUGH Sun (Auckland), Volume 1, Issue 92, 9 July 1927, Page 13
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.