WORK IN KAIPARA
Work is being pushed ahead in the Pukehuia and Kirikopuni districts, where the Public Works Department has 400 men engaged. To the south of Pukehuia the men are engaged metalling roads to the station and settlers’ roads. Work is also proceeding on Wairoa bridge. The steel superstructure is being assembled, and huge piles of 60ft. to 100 ft. driven to carry the approach to the bridge.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19270624.2.155.5
Bibliographic details
Sun (Auckland), Volume 1, Issue 79, 24 June 1927, Page 12
Word Count
69WORK IN KAIPARA Sun (Auckland), Volume 1, Issue 79, 24 June 1927, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.