TARANAKI OILFIELDS
PROGRESS REPORT Press AssociationNEW PLYMOUTH, To-« Taranaki Oilfields report:-**: No. 2 well drilled out; cement « ■ ft; now testing shut-off. i No. 3 drilled to 69ft in * ott ‘r then 2ft gravel and 12«• » haI '■ stove-pipe casing to ‘ 7lt ; . rA& -. collar ready to drill for 15® Gisborne well: Erection o*. in progress.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19270427.2.29.8
Bibliographic details
Sun (Auckland), Volume 1, Issue 29, 27 April 1927, Page 2
Word Count
53TARANAKI OILFIELDS Sun (Auckland), Volume 1, Issue 29, 27 April 1927, Page 2
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.