GRAFTON BRIDGE
TO BE PAVED SHORTLY Paving of Grafton Bridge will commence within a fortnight. The Xeuchatel Asphalt Company will do the work at a contract price of £994. There are 2567 square yards, so the price is at 7s 9d a yard. The new paving will be two inches thick, and the old surface will be removed before the new is laid.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19270416.2.56
Bibliographic details
Sun (Auckland), Volume 1, Issue 21, 16 April 1927, Page 7
Word Count
63GRAFTON BRIDGE Sun (Auckland), Volume 1, Issue 21, 16 April 1927, Page 7
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.