THE FLOODS IN N.S.W.
RESTORING COMMUNICATION. l j>y Electric Telegraph—Copyright] [United Press Association. ] Sydney, May 21.
The flood subsidence is so slow that a full restoration of railway communication is not expected before Friday. Numerous landslips followed the floods, adding large ly to the damage age.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/STEP19130522.2.27
Bibliographic details
Ngā taipitopito pukapuka
Stratford Evening Post, Volume XXXVI, Issue 14, 22 May 1913, Page 5
Word count
Tapeke kupu
46THE FLOODS IN N.S.W. Stratford Evening Post, Volume XXXVI, Issue 14, 22 May 1913, Page 5
Using this item
Te whakamahi i tēnei tūemi
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.