WORK AT MANGAHAO.
CURRENT BY NEXT JUNE? “Everything is going on all right according to programme,” stated the Hon. J. 6. Coates (Minister for Public Works) on Saturday morning with reference to his visit, of inspection, the day before to the hydro-electric development works at Mangjahao. “Front a layman’s point of view.” added the. Minister, “the Manga,hao dam seems to be the controlling lactor; and,, if we have -the luok to go on without (a flood, we should be ready to supply current by the end of June next.”
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/SNEWS19230907.2.12
Bibliographic details
Ngā taipitopito pukapuka
Shannon News, 7 September 1923, Page 3
Word count
Tapeke kupu
89WORK AT MANGAHAO. Shannon News, 7 September 1923, Page 3
Using this item
Te whakamahi i tēnei tūemi
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.