Ruapehu District Council engineer Don Sattler checks the water pressure on the new line to Soldiers Road while contractors Graeme Stewart, left, lan Crutchley, kneeling and Dean Stewart look on. Ohakune conservation officer Lisle Irwin checks progress. The new pipe which takes water through a section of the Tongariro National Park to the new water treatment site, was completed last week.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/RUBUL19920211.2.22.1
Bibliographic details
Ngā taipitopito pukapuka
Ruapehu Bulletin, Volume 9, Issue 423, 11 February 1992, Page 5
Word count
Tapeke kupu
61Ruapehu District Council engineer Don Sattler checks the water pressure on the new line to Soldiers Road while contractors Graeme Stewart, left, lan Crutchley, kneeling and Dean Stewart look on. Ohakune conservation officer Lisle Irwin checks progress. The new pipe which takes water through a section of the Tongariro National Park to the new water treatment site, was completed last week. Ruapehu Bulletin, Volume 9, Issue 423, 11 February 1992, Page 5
Using this item
Te whakamahi i tēnei tūemi
Ruapehu Media Ltd is the copyright owner for the Ruapehu Bulletin. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Ruapehu Media Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.