Rotorua-Tauranga Highway.
Many uncomplimentary i'e®| have in the past been made conceij the state of the main Rotorua-.! ranga highway. Motorists will w 1 near future however, have little S son for such complaints, as ti16 'w way beyond Te Puke is now h9 tar-sealed. A considerahle P°j| has already been completed an ■ remaining rough spots are i'aM d'sappearing. M . . ■ 1 1 ■ ■ ■ ii ■ — -B
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/RMPOST19320426.2.23
Bibliographic details
Rotorua Morning Post, Volume 1, Issue 207, 26 April 1932, Page 4
Word Count
64Rotorua-Tauranga Highway. Rotorua Morning Post, Volume 1, Issue 207, 26 April 1932, Page 4
Using This Item
NZME is the copyright owner for the Rotorua Morning Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.