EAST COAST ROAD
POWER SHOVELS TO ARRIVE
WIDENING OF ROAD
BIG PROGRAMME AHEAD
A big programme is ahead for the Public Works Department on the East Coast main highway, and with the arrival of two power shovels by ■ boat tbis week, work will lie expedited considerably. A special the Motu, will bring the shovels from Auckland, and it is expected that both the Motu and the Waiotahi will arrive in Opotiki this week. The Motu is equipped with the necessary apparatus to lift the heavy machinery. The building of bridges on the Coast- is a very difficult job and the ' Raukokore river-bridge has been held up considerably on account of unfavourable weather. Ten more spans el this bridge still remain to be com- •’ pletod. Pile driving apparatus for the Keren river bridge was taken to the site of the bridge during the weekend and it is expected that a start will be made shortly on this bridge.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/OPNEWS19380905.2.9
Bibliographic details
Ngā taipitopito pukapuka
Opotiki News, Volume I, Issue 79, 5 September 1938, Page 2
Word count
Tapeke kupu
157EAST COAST ROAD Opotiki News, Volume I, Issue 79, 5 September 1938, Page 2
Using this item
Te whakamahi i tēnei tūemi
Opotiki News (1996) Ltd is the copyright owner for the Opotiki News. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Opotiki News (1996) Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.