Thank you for correcting the text in this article. Your corrections improve Papers Past searches for everyone. See the latest corrections.

This article contains searchable text which was automatically generated and may contain errors. Join the community and correct any errors you spot to help us improve Papers Past.

Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

MANAGERS' REPORTS.

Tellurides Proprietary.—The low level crosscut in the Volunteer section is in 73 feet, and penetrating a section ot splendid country highly charged with mineral, and small quartz veins are nqw showing in this face. On the surface sat the outcrop of this lode some fair prospects of free gold have been got The low level passing through the Gordon section has been extended a further 10 feet, but the ground is very tight and progress is consequently slow. The air compressor is now in working order again, and driving with the rock drills should be resumed on Monday.

Rising Sun.—-The tunnel is in 1544 feet. The ground is rather slower for

working.

Permanent link to this item
Hononga pūmau ki tēnei tūemi

https://paperspast.natlib.govt.nz/newspapers/OG19110428.2.18.1

Bibliographic details
Ngā taipitopito pukapuka

Ohinemuri Gazette, Volume XXII, Issue 2783, 28 April 1911, Page 2

Word count
Tapeke kupu
114

MANAGERS' REPORTS. Ohinemuri Gazette, Volume XXII, Issue 2783, 28 April 1911, Page 2

MANAGERS' REPORTS. Ohinemuri Gazette, Volume XXII, Issue 2783, 28 April 1911, Page 2

Help

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert