POWER SHORTAGE
WESTPORT SCHEME DELAYED CABLE ON SUNKEN LINER (Per United Press Association) WESTPORT. Sept. 9. The Westport Borough Council nas been advised that 35 miles of electric cable intended for use in linking Denniston up electrically with Westport was on a liner which has been sunk by enemy action. The cable was expected to arrive very shortly. This loss will mean that Westport must continue to endure black-outs at night unless there is a heavy or plentiful rainfall, a s the water in Lake Rochfort, the present main source of supply of electric current, is still very low.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/ODT19400910.2.87
Bibliographic details
Ngā taipitopito pukapuka
Otago Daily Times, Issue 24399, 10 September 1940, Page 8
Word count
Tapeke kupu
99POWER SHORTAGE Otago Daily Times, Issue 24399, 10 September 1940, Page 8
Using this item
Te whakamahi i tēnei tūemi
Allied Press Ltd is the copyright owner for the Otago Daily Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence. This newspaper is not available for commercial use without the consent of Allied Press Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.