SEATOUN HEIGHTS
‘WATER AND DRAINAGE Half the work of laying the new water supply and sewerage at Seataun Heights lias now been done. A report which Mr Morice, oity waterworks and drainage engineer, has made to the City Council states that 175 chains of water mains has been laid to date, and that water is now available for residents of the Heights where the mains are. Chains of sower laid to. date total 277. About five miles of water mains and the same distance” of sewer remain to be laid.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/NZTIM19261126.2.90
Bibliographic details
Ngā taipitopito pukapuka
New Zealand Times, Volume LIII, Issue 12614, 26 November 1926, Page 7
Word count
Tapeke kupu
90SEATOUN HEIGHTS New Zealand Times, Volume LIII, Issue 12614, 26 November 1926, Page 7
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the New Zealand Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.