BRITISH SHIPBUILDING
PROGRESSING FASTER THAN EVER U.S. YARDS COPY METHODS London, Oct. 15. Britain is building ships faster than ever. A 10,000-ton vessel was recently launched and ready for the sea nine weeks after the first plates were laid. A slightly smaller vessel was completed in seven weeks. One shipyard is launching a 10,000-ton ship every three weeks. These records are attained despite the blackout handicap. Some marine engineering firms are turning out a complete engine set every fortnight. The prefabrication method of construction has been employed in Britain for more than a year and engineering works throughout the country are making standardised ship parts for assembly at shipyards American yards are increasingly following British ship-welding methods. A total of 75 per cent, of British ships is now welded. Some of Britain’s largest tankers are now almost completely welded.—P.A.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NEM19421017.2.100
Bibliographic details
Nelson Evening Mail, Volume 77, 17 October 1942, Page 5
Word Count
139BRITISH SHIPBUILDING Nelson Evening Mail, Volume 77, 17 October 1942, Page 5
Using This Item
Stuff Ltd is the copyright owner for the Nelson Evening Mail. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.