NEW COACHES.
FOR UNDERGROUND TRAINS. (British Official Wireless.) RUGBY, Jan. 18. The London Passenger Transport Board has ordered 2050 new coaches for underground trains, costing about £6.000,000. The contracts stipulate that 500 must be delivered this year. The driving equipment of the new trains for the first time will be underneath the floor-boards, and the entire train will he available for passengers. The trains will accelerate to the rate of 20 miles an hour' in 10 seconds, and, as a result, it will be possible to run far more trains in rush hours. It is stated that the trains will he superior in every respect to any others in the world.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/MS19380120.2.94
Bibliographic details
Manawatu Standard, Volume LVIII, Issue 44, 20 January 1938, Page 9
Word Count
111NEW COACHES. Manawatu Standard, Volume LVIII, Issue 44, 20 January 1938, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Manawatu Standard. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.