DELAY IN SURFACE SEALING HIGHWAY.
MEANS INCREASED MAINTEN ANCE COSTS.
•Something should be done by the Automobile Association, local ‘Borough Council and Chamber of 'Commerce to back up the Manawatu County 'Council’s representations to the Highways Board concerning the immediate necessity for completing the portion of the Wcllington-Auck-land highway extending from the borough boundary to Himatangi and from Himatangi to Rangiotn on the Foxton-Palmerston North section. All the preparatory work on these sections has been completed and ready for bituminous sealing. Delay in completing this work is adding considerably to the Council’s maintenance cost and, further, may necessitate remetalling.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/MH19300318.2.28
Bibliographic details
Ngā taipitopito pukapuka
Manawatu Herald, Volume LI, Issue 4428, 18 March 1930, Page 3
Word count
Tapeke kupu
99DELAY IN SURFACE SEALING HIGHWAY. Manawatu Herald, Volume LI, Issue 4428, 18 March 1930, Page 3
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Manawatu Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.