Thank you for correcting the text in this article. Your corrections improve Papers Past searches for everyone. See the latest corrections.

This article text has been partially corrected by other Papers Past users. Join the community and correct any errors you spot to help us improve Papers Past.

Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

MAIN HIGHWAYS.

AMOUNTS ESTIMATED FOR CONSTRUCTION.

Road construction in the vicinity of Wellington will receive a good deal of attention during the coming year, according to the Main Highways Board estimates recently released. The largest item on the Wellington-Manawatu highway is £10,000 to be spent on the Horo-kiwi-Paekakariki section, while £9,131 will be devoted to the ParemataWaikanae section. The road from Upper Hutt to Waikanae will have £4500 spent on it. Two other large allocations are £11,250 for the Sanson-Awahuri section and £13,200 for the Hima-tangi-Rangiotu section. In some instances the Highways Board bears the total cost of the construction, and in others the particular local body in whose territory the road is situated finds a proportion. DISTRICT ALLOCATIONS.

In the list of the district allocations for the No. 9 District published below, the amount to be expended on the portion of road is shown and the proportion required from the local body is stated in parenthesis.

Wellington-Auckland, via Taranaki. — Levin-Whirokino bridge, £5,500 (£3-£1); Foxton-Himatangi, £4848 (£2-£1). Foxton-Shannon. — Manawatu River bridge, £29 (free); Manawatu River bridge approach— Manawatu County, £300 (free); Shannon Borough, £20 (free); Horowhenua County, £80 (free); dismantling old bridge, £60 (free); Manawatu County Road formation, £420 (£1 1/2-£1); Horowhenua County (road formation), £50 (free); Horowhenua County (land compensation), £320 (free); paving Manawatu and Mangaore bridges, £10 (free); Shannon Borough, £50 (free); Shannon Borough (Sheehan Street), £190 (£2-£1).

Himatangi-Ashhurst, via Palmerston North. —Himatangi-Rangi-otu, £1300 (£3-£1); Burke’s Drain bridge, £357 (£2-£1); RangiotuLongburn, £3000 (£3-£1); Awapuni bridge, £903 (£2-£1); Bullocky Creek bridge, £44 (£2-£1).

Permanent link to this item
Hononga pūmau ki tēnei tūemi

https://paperspast.natlib.govt.nz/newspapers/MH19291109.2.21

Bibliographic details
Ngā taipitopito pukapuka

Manawatu Herald, Volume L, Issue 40021, 9 November 1929, Page 3

Word count
Tapeke kupu
254

MAIN HIGHWAYS. Manawatu Herald, Volume L, Issue 40021, 9 November 1929, Page 3

MAIN HIGHWAYS. Manawatu Herald, Volume L, Issue 40021, 9 November 1929, Page 3

Help

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert