HIGHWAYS CONSTRUCTION.
POXTON-HIM! AT AN GI SECTION. At yesterday’s meeting .of the Manawatu lOounty Council, the act-ing-engineer (Mr. H. V. Bond) reported on the Foxton-Himatangi section' of the main highway as follows : . Tenders were called for sections of the formation work on tins road, hut none of these were accepted. The work is now being carried out by day labour. A contract has been let for the quarrying and loading of metal at the Terrace End pit, and metalling operations will be commenced in about a week’s time. The gang of workmen on the above road are making rapid piogress and familiar sandhills along portion of the road have been levelled and depressions filled. Most of the men employed belong to Foxton.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/MH19290112.2.13
Bibliographic details
Ngā taipitopito pukapuka
Manawatu Herald, Volume L, Issue 3894, 12 January 1929, Page 2
Word count
Tapeke kupu
122HIGHWAYS CONSTRUCTION. Manawatu Herald, Volume L, Issue 3894, 12 January 1929, Page 2
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Manawatu Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.