WATER AND DRAINAGE.
ENGINEER'S REPORT. ESTIMATED COST At last night’s Council meeting Mr H. W. Clitnie, the civil engineer appointed by the Council to submit a report on the proposed water and drainage schemes for the borough, submitted for the Council’s consideration his report, also forwarding a plan showing the portions of the borough that would be served by the proposed water supply scheme. Mr Climie states that he has made ample allowance for all contingencies and the cost of the scheme will not be more than his estimate. His estimate of the total cost of scheme for water supply is ,£10,195 2s, and for a sanitary drainage system £B6~o 14s. He estimates the annual cost to the borough at £I2OO, being £940 for interest and £260 for working expenses and up-keep on engines and plant. The full report will appear in our next issue. It was decided to hold a special meeting to discuss the schemes on a date to be fixed by the Mayor.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/MH19091214.2.23
Bibliographic details
Ngā taipitopito pukapuka
Manawatu Herald, Volume XXXI, Issue 609, 14 December 1909, Page 3
Word count
Tapeke kupu
166WATER AND DRAINAGE. Manawatu Herald, Volume XXXI, Issue 609, 14 December 1909, Page 3
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Manawatu Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.