INDEPENDENT.
During the time the new tunnel has been in course of construction and until lately the driving has been exceedingly good, during the last fortnight n very hard bar has been met with and continues so to the present time. The leugtu of the tunnel is 550 feet.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/IT18771116.2.6.3
Bibliographic details
Inangahua Times, Volume IV, Issue 96, 16 November 1877, Page 2
Word Count
49INDEPENDENT. Inangahua Times, Volume IV, Issue 96, 16 November 1877, Page 2
Using This Item
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.