MINING
' MATAKI DREDGE A return for the last week of 27 oz Bdwt for 114 hour’s work, including a portion of the time spent in dredging tailings, is reported by Mataki Gold Dredging, Limited, Murchison. The /jompany also states that during the week the dredge had to be turned .around to dredge out tailings to give .sufficient clearance under the ship to Jcwer the water another four feet. A small dam was made at the cost of £35, and with the assistance of this water the dredge has been lowered to the level of tho old river hod, This operation necessitated a considerable amount of material being shifted three times.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/HOG19330920.2.25
Bibliographic details
Ngā taipitopito pukapuka
Hokitika Guardian, 20 September 1933, Page 4
Word count
Tapeke kupu
110MINING Hokitika Guardian, 20 September 1933, Page 4
Using this item
Te whakamahi i tēnei tūemi
The Greymouth Evening Star Co Ltd is the copyright owner for the Hokitika Guardian. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of the Greymouth Evening Star Co Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.