MAIN HIGHWAYS
ERECTION OF BRIDGES
Considerable work in connection with the erection of bridges on the main West Const roads is going on at present. The foundations for the iron traffic bridge across the Wnilio River are being put down, and the girders and ironwork for the superstructure are lying carried from Ross to the bridge site. The new traffic bridge at Frosty Greek, about eight miles south of Hokitika. has been opened for traffic. The ferro-cmierete piers for the bridge across the Innngnlma River, on the Roefton-Nelsoii road, are almost completed, and the ironwork for the bridge is being made in Christchurch. Tt is expected that the bridge will he opened in February next. A -I'tOft. bridge (with four spans of 11 Oft.l has been completed ever the TCarnmOa .River, T>v Messrs ft. mul S. Atkinson. A number of improvements have been effected in the "Boiler Gorge road and a dangerous portion of Hawk’s Craig removed.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/HOG19251204.2.10
Bibliographic details
Ngā taipitopito pukapuka
Hokitika Guardian, 4 December 1925, Page 1
Word count
Tapeke kupu
157MAIN HIGHWAYS Hokitika Guardian, 4 December 1925, Page 1
Using this item
Te whakamahi i tēnei tūemi
The Greymouth Evening Star Co Ltd is the copyright owner for the Hokitika Guardian. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of the Greymouth Evening Star Co Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.