Breakwater Construction
'Praise of the economical and thorough manner in which the construction of the New Plymouth breakwater was being proceeded with was contained in a report to the New Plymouth Harbour Board from Messrs. Vickerman and Lancaster, the board’s consulting engineers.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/GISH19391218.2.43
Bibliographic details
Gisborne Herald, Volume LXVI, Issue 20123, 18 December 1939, Page 4
Word Count
42Breakwater Construction Gisborne Herald, Volume LXVI, Issue 20123, 18 December 1939, Page 4
Using This Item
The Gisborne Herald Company is the copyright owner for the Gisborne Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of the Gisborne Herald Company. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.