REEFTON QUARTZ MINING.
Progress Mines— The total quantity of rock mined was 4864 tons, which was transported to mill and crushed, the yield bsing 18320zs lOdwts 18grs valued at £7,604 16s lid. Eighty five tons of concentrates were chlorinated, yielding bullion to the value of £1.203 7s Bd. The development work consisted of 403 feet of driving and cross-cutting and 21 feet of sinking.
Wealth of Nations— During the month 1030 tons of quartz were crushed, yielding 3500zs Odwts 3grs, valued at £1458 Os Id. Seven tons of concentrates were produced and 684 tons of coarse sands cyanided, the latter yielding bullion to the value of £368 3s 6d. On the surface the road to the head of the Energetic shaft has been widened and is practically complete.
Golden Fleece— l 226 tons of quartz we;:e crushed for a return of 481ozs 12dwts of bullion, valued at £1938 8s 9J. 10J tons of concentrates were saved, and 1040 tons of tailings cyanided, the latter yielding bullion to the value of £565 7s 4d.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/GEST19011114.2.13
Bibliographic details
Ngā taipitopito pukapuka
Greymouth Evening Star, Volume XXXI, 14 November 1901, Page 2
Word count
Tapeke kupu
173REEFTON QUARTZ MINING. Greymouth Evening Star, Volume XXXI, 14 November 1901, Page 2
Using this item
Te whakamahi i tēnei tūemi
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.