Thank you for correcting the text in this article. Your corrections improve Papers Past searches for everyone. See the latest corrections.

This article contains searchable text which was automatically generated and may contain errors. Join the community and correct any errors you spot to help us improve Papers Past.

Article image
Article image
Article image
Article image

Pohangina Bridge Contract

* The following are particulars v connection with the above contract :— The deposit with tenders must b< £300 ; bond £1400 ; penalty for over time, £20 per week ; time for com pletion, 19 months. The bridge is t< be a cylinder bridge, 4ft 6in cylinders, 48 feet in length, with 8 spans of 8( feet and iron girders ; and six timber spans of 13 feet. All the iron foi girders and cylinders has to be manufactured in the colony, including bolts and rivets. Cast iron to be imported in the term of pig iron, and malleable iron exactly in the state in which it i leaves the rolling mills. The for* ! mation level is to be 14 feet above the highest recorded flood and about 25 feet above low water.

Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/FS18880911.2.18

Bibliographic details

Feilding Star, Volume X, Issue 40, 11 September 1888, Page 3

Word Count
131

Pohangina Bridge Contract Feilding Star, Volume X, Issue 40, 11 September 1888, Page 3

Pohangina Bridge Contract Feilding Star, Volume X, Issue 40, 11 September 1888, Page 3

Help

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert