BREAKDOWN AT POWER HOUSE.
OVERLOADING THE CAUSE.
ADDITIONS TO PLANT NECESSARY
During the last few days the electric light system in the Borough has been somewhat irregular, and has been causing some anxiety The reason of this irregularity is a temporary breakdown of a dynamo at the power station, due to overloading. The demand for electric current in the Borough has been enormous, in fact too great for the present plant, and unless something is done sooner or later, there will be cause for ■'alarm. The disabled dynamo is undergoing- repairs, and until the work is completed consumers should adopt the strictest economy.
At Monday's meeting of the Council the Electric Committee reported that the recent breakdown at the power house emphasises the necessity for urgent action in the matter of .additions to the plant. The committee hope'' to present a report on the matter at the next meting of the Council.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/FRTIM19210722.2.16
Bibliographic details
Franklin Times, Volume 9, Issue 652, 22 July 1921, Page 5
Word Count
152BREAKDOWN AT POWER HOUSE. Franklin Times, Volume 9, Issue 652, 22 July 1921, Page 5
Using This Item
Stuff Ltd is the copyright owner for the Franklin Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.