RAGLAN COUNTY.
ENGINEER’S REPORT. The engineer (Mr. G. W. King), in his monthly report to the Raglan County Council, stated that work on the Port Waikato to Tuakau bridge road was being continued. Surface work was being carried out in the Onewhero Riding. There was no maintenance work to report in the Pukekawa Riding. In the Whangape Riding surface work and grading had been continued, Caughlev’s to West Coast road had been .repaired, whilst contracts had been let for the whole of the length between Rotongaro and Rnngiriri, and good progress had been made. Pukekawa-Whangape Loan Works. — The Pukekawa and Glen Murray landing section had received a set-back owing to all the labour leaving the work. A, new party had now been engaged, and earthworks would be completed at an early date.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/FRTIM19210322.2.31
Bibliographic details
Franklin Times, Volume 9, Issue 618, 22 March 1921, Page 5
Word Count
132RAGLAN COUNTY. Franklin Times, Volume 9, Issue 618, 22 March 1921, Page 5
Using This Item
Stuff Ltd is the copyright owner for the Franklin Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.