GOLD DREDGING RETURNS.
'(By Telegraph— Press Association.) GREYMOUTH, October 7. ■ The Nemoria: dredge return was 56 ounces from 13,500 cubic yards worked m 116 hours. The Bundi dredge return was 104oz of smelted gold from 12,420 cubic yards for 95 hours. : The Mossy Creek dredge washed up for 28oz2dwt. -
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19381008.2.124.7
Bibliographic details
Evening Post, Volume CXXVI, Issue 86, 8 October 1938, Page 12
Word Count
49GOLD DREDGING RETURNS. Evening Post, Volume CXXVI, Issue 86, 8 October 1938, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.