PILOT BORE FINISHED
TUNNEL UNDER THE THAMES
(British Oftlcial Wireless.)
RUGBY, October 5,
.The pilot boring of the Dartford to Purfleet tunnel under the Thames which will join the counties, of Essex and Kent, was completed yesterday, when the last five feet of the curtain of chalk was broken through. There was an error of only three-eighths o£ an inch in the line and three-sixteenths of an inch in the level of the tunnel when the two borings from the Essex and Kent sides met. The total length of the pilot tunnel is 2832 feet.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19381007.2.70
Bibliographic details
Evening Post, Volume CXXVI, Issue 85, 7 October 1938, Page 9
Word Count
95PILOT BORE FINISHED Evening Post, Volume CXXVI, Issue 85, 7 October 1938, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.