MINING NEWS
The secretary of 'the Stock Exchanga Association of New Zealand has received from Mount Morgan Company, Sydney, the following production report for foiir weeltt. ended May 26:-— Ore mined; 45,304 ions; ore treated, sulphide 24,900 tons, . oxidised 18,618 tons*' production (estimated), gold 4173 oz, silver 9440z, cbp^per 151 tons. OKARITO DREDGING. Okarito Five Mile Beach Gold Dredging Co., Ltd., reports the following report for four weeks from April 24-to May 15:—Total gold won, 920z 19dwt; total time worked. 421J hours; total non-working time. 154J hours: total yardage treated. 25,591, an average of 62 1 cubic yards per hour; average value of ground (on basis of gold worth' £4 per ounce), 2.7 d per cubic yard. Okarito return for the wyek ended May 29 was 260z I2dwt f0r.."129 hourr dredging.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19370602.2.24
Bibliographic details
Evening Post, Volume CXXIII, Issue 129, 2 June 1937, Page 4
Word Count
131MINING NEWS Evening Post, Volume CXXIII, Issue 129, 2 June 1937, Page 4
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.