CONTRACTS ARRANGED
SAN FRANCISCO BRIDGE
SAN PEANCISCO, 7th November
Preliminary contracts have been arranged for the Golden Gate Bridge, which is expected to cost £7,000,000. The American firm of John Koebling will furnish the stool cables for .£1,160,000. . - - -
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19321119.2.80
Bibliographic details
Evening Post, Volume CXIV, Issue 122, 19 November 1932, Page 13
Word Count
38CONTRACTS ARRANGED Evening Post, Volume CXIV, Issue 122, 19 November 1932, Page 13
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.