WORK ON THE HUTT ROAD
,: (To the Editor.) Sir,—Extensive pipe-laying operations are being carried out on the Hutt road, and tho bitumen surface is much disturbed. Lt is to be hoped that those responsible for tho present work will see that the bitumen is thoroughly and smoothly replaced or remade. —I am, etc., ■ ANXIOUS.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19310210.2.38.3
Bibliographic details
Evening Post, Volume CXI, Issue 34, 10 February 1931, Page 8
Word Count
54WORK ON THE HUTT ROAD Evening Post, Volume CXI, Issue 34, 10 February 1931, Page 8
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.