NEW BRIDGE OPENED
COST BELOW ESTIMATE
(By Telegraph.—Press Association.)
TIMARU, This Day. IJie new ferro-ecracrete bridge over the Pareora Eiver on the main Christ-church-Dunedin highway was officially opened for traffic yesterday in the presence of a large gathering of the public ana representatives of local bodies from Ashburton to Oamaru. The estimated cost of the bridge, which was constructed by the Public Works Department, was £15,000, but it was completed for £11,400. Of this amount the Highways Board is finding £7000 In the absence of the Minister of Pubbe Works, the bridge was opened TO M* * Bftehanesr, MJ>. for Waitaki,
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19291205.2.28
Bibliographic details
Evening Post, Volume CVIII, Issue 136, 5 December 1929, Page 7
Word Count
100NEW BRIDGE OPENED Evening Post, Volume CVIII, Issue 136, 5 December 1929, Page 7
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.