DISMANTLING THE TOMB
OPERATIONS AT LUXOR.
(UNITID FKIU A)IOCUT!O!f.— COPTSIOIT.)
CSTDNEY SDH CABLB.) tv j- LUXOR, 23rd January. .The dismantling of the outer shrine of the tomb is completed. The fourteen sections, have been packed in cottonwool to preserve the fragile gilding without mishap. The second shrine will be tackled to-morrow. More rapid pro r gress in future operations is anticipated.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19240125.2.75
Bibliographic details
Evening Post, Volume CVII, Issue 21, 25 January 1924, Page 7
Word Count
61DISMANTLING THE TOMB Evening Post, Volume CVII, Issue 21, 25 January 1924, Page 7
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.