HUTT ROAD PIER
WORK ON FOUNDATION BEGUN A start was made by the Public Works Department on Wednesday with the construction of the much-discussed railway pier over the Hutt Road, between'Kiawarra and Ngahauranga. A fence has been erected round the spot to protect the workmen engaged in the excavation work and to keep the lines of.traffic in and out of the city apart. A large “danger” notice has been erected on either side of the pier site, warning motoring public of the obstruction.:
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/DOM19280224.2.43
Bibliographic details
Ngā taipitopito pukapuka
Dominion, Volume 21, Issue 125, 24 February 1928, Page 8
Word count
Tapeke kupu
83HUTT ROAD PIER Dominion, Volume 21, Issue 125, 24 February 1928, Page 8
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.