PAVED ROADS FOR EASTBOURNE
A START ON MONDAY A start is to be made on Monday with the paving of the road from Day’s Bay to Eastbourne, and also the road which leads to the main Eastbourne road from the ferry wharf at Rona Bay. At present the paved road which goes through Day’s Bay only extends as far south as the boundary between the Hutt County and Eastbourne Borough. Further south the road has been widened slightly, at what was its narrowest part, and a concrete revetment built just above high-water mark to hold the extra width of road provided. The width of the paved roadway in Eastbourne will be 18ft.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/DOM19280210.2.81
Bibliographic details
Ngā taipitopito pukapuka
Dominion, Volume 21, Issue 113, 10 February 1928, Page 10
Word count
Tapeke kupu
112PAVED ROADS FOR EASTBOURNE Dominion, Volume 21, Issue 113, 10 February 1928, Page 10
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Log in