OTIRA TUNNEL
. THE DISPUTE SETTLED. A settlement of the Otira, tunnel dispute was reported to the Minister of Public Woilcs (Mr. Conies) on Saturday. The tunnel workers at the Boaley eud have accepted the Minister's offer of a renewal of the contract system at 2245. per foot, with a bonus of 10 per cent, at the end of twelve months' continuous work.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/DOM19200809.2.15
Bibliographic details
Ngā taipitopito pukapuka
Dominion, Volume 13, Issue 270, 9 August 1920, Page 4
Word count
Tapeke kupu
62OTIRA TUNNEL Dominion, Volume 13, Issue 270, 9 August 1920, Page 4
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.