BORING FOR OIL
OPERATIONS TO BE RESUMED AT GI3BORNE. By Tsleeraph.—press Assoolatlon. Gisborno, May G. Boring operations are about to bo re; sumed by private enterprise at Waitangi Hill, the site of tho Gisborno Oil Company's bore, in order to thoroughly test the oil flow struck at the 665 ft. level.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/DOM19190507.2.29
Bibliographic details
Ngā taipitopito pukapuka
Dominion, Volume 12, Issue 190, 7 May 1919, Page 6
Word count
Tapeke kupu
51BORING FOR OIL Dominion, Volume 12, Issue 190, 7 May 1919, Page 6
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.